Substation reliability requires proper commissioning and periodic maintenance of the protection and control systems.

Blue Arc Energy Solutions has the experience and knowledge to get your project’s commissioning testing completed

properly and periodically maintained in compliance with NERC protection maintenance requirements. Blue Arc brings

years of experience in all aspects of the protection and control asset’s maintenance lifecycle: from initial

commissioning, isolated repairs, substation emergencies, periodic maintenance, and decommissioning.

 

                                                             to help find solutions to your substation testing service needs.

• On-Site Design Review

• Workmanship & Quality Checks

• DC Distribution & Protection Systems

• AC Distribution & Protection Systems

• Current and Potential Circuits

• Tripping Control Circuits

• Switchgear Testing

• Circuit Breaker Control Testing

• Transformer Control Testing

• Testing Oversight Services

Contact Blue Arc Energy Solutions